General design and general contract for the technical re-equipment of three boiler houses, with the installation of three heat recovery units at the boiler houses.
Design, manufacture, supply and installation of equipment, tying of technological pipelines and installation of gas ducts, commissioning and regular adjustment of boilers
Customer: