Chimney design is always carried out individually: for a specific object, with established parameters and operating conditions. For long-term and safe operation of the chimney, it is necessary to design it in accordance with all current norms and rules, the needs of the Customer, wind loads, as well as the seismicity of the area where the object is located.
We are engaged in the production of project documentation for smoke pipes. The chimney project is based on the section “Metal constructions” and the task of designing the chimney foundation, but, at the Customer’s request, the company’s specialists will also perform other sections, including section “Chimney foundation”.
The company’s specialists can offer you the implementation of one or all stages of the development of the chimney project: a sketch project, a working project or working documentation.
In accordance with the current regulatory documentation, industrial smoke pipes, free-standing pipes, which are part of a facility classified as a hazardous production facility, are subject to mandatory registration and supervision by the territorial bodies of the State supervision .
After the Customer approves the design solution and the completeness of the chimney, we proceed to the manufacturing stage.
For more than 20 years, it has been manufacturing metal smoke pipes of various designs: self-supporting, on braces, truss-type pipes with one or more gas discharge barrels, as well as column and facade smoke pipes.
Pipe production is carried out according to technological maps and includes the following stages:
The chimney can be delivered by road or rail, depending on the place of installation. The installation of the pipe is carried out by specialists in the shortest possible time using all the necessary equipment. In the installation process, additional equipment for the pipe is also installed: