Kyiv, blvd. Vaclav Havel, 8.
Technical re-equipment with the installation of two heat recovery units with an intermediate coolant, adjustment of a 1.6 MW natural gas water heating boiler
Customer:
Technical re-equipment with the installation of two heat recovery units with an intermediate coolant, adjustment of a 1.6 MW natural gas water heating boiler